Centerline Utilities Projects

Centerline Projects

Atlantic Commons Plat 5 for GL Homes

Atlantic Commons Plat 5 for GL Homes

Project Date: 2015-2016

Project Description:Complete site utility package, inclusive of storm drainage, sanitary sewer, lift stations, water line and fire line. Additional Information: Multi Phased Project to support expedited roadway construction.

Ft. Pierce Service Plaza Reconstruction for Community Asphalt

FL Turnpike, Ft. Pierce Service Plaza. Reconstruction for Community Asphalt

Project Date: 2015-2016

Project Description:Construct New Utility and Drainage Infrastructure for Modernized Service Plaza Additional Information: Project is highly phased in an effort to maintain existing motorist services while plaza facilities are being upgraded.

Design/Build Widening & Reconstruction of I-95

Design/Build Widening & Reconstruction of I-95 from SR-60 to CR-512 in Indian River County for Community Asphalt Corp.

Project Date: 2015-2016

Project Description: Project involves removing & replacing 10 EA, large diameter cross drain culverts passing under the Interstate right-of-way. Additional Information: Culvert sizes range from single barrel 53" x 83" ERCP to triple-barrel 96" RCP.

Loxahatchee Groves Commons Publix for Atlantic Land

Loxahatchee Groves Commons Publix for Atlantic Land

Project Date: 2015-2016

Project Description: Loxahatchee Groves Commons is a 30 acre commercial plaza anchored by Publix & Tractor Supply. Centerline is contracted to build the drainage, utilities, earthwork & roadways. Additional Information: This was a challenging project, as it was delayed for several months upfront, yet the end date did not change.

Centerline had to supply additional crews to get the utilities installed in a tight schedule. Utilities were completed 3 weeks ahead of the original contract schedule. Centerline also contracted the earthwork & roadways in order to provide the client a complete site development package.

Seagate Country Club for Seagate Construction

The Reserves at Vero Beach for Mancil's Tractor Service

Project Date: 2015-2016

Project Description: Construct underground utilities and drainage infrastructure for new, mixed use commercial/residential development in Vero Beach, FL. Additional Information: Project includes over 6000 LF of HDPE drainage culvert, 2800 LF of sanitary gravity sewer & 4500 LF of water main.

Seagate Country Club for Seagate Construction

Seagate Country Club for Seagate Construction

Project Date: 2015-2016

Project Description: Complete underground utilities package. Additionally, Centerline Utilities Inc. self- performed the dirt work and the asphalt scope of work. Additional Information: Provided earthwork services to support construction of a 200' long seawall

Pioneer Rd. Commercial for Pebb Enterprises

Pioneer Rd. Commercial for Pebb Enterprises

Project Date: 2015

Project Description: The project contains (3) 72" headwalls. The backhoe is swinging the 72" RCP, to connect the pipe joints from the headwall. The overall project is a complete utility installation, containing a private lift station, (3) 72" headwalls, (1) 24" headwall, exfiltration drainage system, sanitary sewer, fire line and water line.

American Express for Turner Construction

American Express for Turner Construction

Project Date: 2015

Project Description: Project Description: The American Express project is located in the City of Sunrise. The project consists of total site work and utility (water, sanitary sewer, storm drainage, fire line) package.

Crystal Riviyera for Allrite Paving Contractors

Crystal Riviyera for Allrite Paving Contractors

Project Date: 2014 - 2015

Project Description: Crystal Riviyera consisted of water line, sanitary sewer, storm drainage, and fire line installation. Centerline Utilities Inc. installed the complete underground utility package.

Jefferson for Current Builders

Jefferson for Current Builders

Project Date: 2014 - 2015

Project Description: Jefferson was a utility only project. Centerline installed the water line, sanitary sewer, and storm drainage. The picture shows the water line being installed.

Value Place Hotel for Integrated Construction

Value Place Hotel for Integrated Construction

Project Date: 2014 - 2015

Project Description: Centerline Utilities Inc. is providing a complete site work and utility package. Our scope of work includes earthwork, paving, water main, fire main, drainage and sewer installation. The job was awarded based off a past relationship. Customer service is one of our core valves.

Akoya for Siemens Group.

Akoya for Siemens Group

Project Date: 2014-2016

Project Description: The Akoya project was located in Boca Raton, FL. It consisted of a complete site work package and utility package, inclusive of sewer, drainage, and water main.

Barnes Blvd. for Jr Davis

Barnes Blvd. for Jr Davis

Project Date: 2014-2016

Project Description: Centerline Utilities Inc. provided labor and equipment for the 10x5 box culvert and elliptical 63"x98" RCP drainage system. Centerline has been challenged with a tight schedule and poor soil conditions, throughout the project.

Boca Pointe Y2 for Merit SPR, LLLP

Boca Pointe Y2 for Merit SPR, LLLP

Project Date: 2014

Project Description: Centerline rehabilitated a lift station at Boca Pointe Y2, installed the complete earthwork scope and underground utilities.

Buffalo Wild Wings for Ram Development

Buffalo Wild Wings for Ram Development

Project Date: 2014

Project Description: Photo depicts the installation of the grease traps at Buffalo Wild Wings. Centerline also installed the complete utility package, including the sanitary sewer, storm drainage, and water main systems.

Lamstein Lane for Community Asphalt

Lamstein Lane for Community Asphalt

Project Date: 2014

Project Description: The project was located directly off Southern Blvd, in West Palm Beach. The drainage system consisted of 48" round RCP pipe. Centerline was challenged with a tight working space and heavy traffic parallel to the pipe ditch.

The Retreat Palm Beach for D Stephenson

The Retreat Palm Beach for D Stephenson

Project Date: 2014-2015

Project Description: The Retreat of Palm Beach has a storm tech underground water storage drainage system, which consists of storm tech beds, HDPE piping, and rock. The storm tech system is another method of onsite water retention in lieu of retention areas. The underground water storage system allows the developer to build less green area retentions and more asphalt parking space.

The Retreat Palm Beach for D Stephenson

Mayfair Estates/Raintree for Standard Pacific

Project Date: 2014-2015

Project Description: Complete utility package, inclusive of water main, fire main, sanitary sewer and storm drainage. There have been many challenges along the way with the fractured rock and running sand, making dewatering close to impossible.

Monaco Blvd. for Palm Beach County Water Utility Department

Monaco Blvd. for Palm Beach County Water Utility Department

Project Date: 2014

Project Description: Centerline replaced a 10" force main at the intersection of Jog Rd and Monaco Blvd. This photo depicts the mill and overlay operation that was necessary to repair Palm Beach County's roadway, once our pipe was installed and trench was repaired.

Palm Beach Outlet Mall-Drainage

Palm Beach Outlet Mall- For Ranger Construction

Project Date: 2013-2014

Project Description: Complete installation of water, sanitary sewer, storm drainage, and fire line. Installation of the French drain exfiltration drainage pipe.

Sawgrass Lakes

Sawgrass Lakes for Guettler Bros
& D R Horton

Project Date: 2013-2014

Project Description: Complete installation of water, sewer, drainage and gravity sewer lift station that services the new residential development.

Encone Country Club Drive Emergency Sewer Repair

Country Club Drive Emergency Sewer Repair for ENCON/LRD

Project Date: January 2014

Project Description: Centerline was called after hours by Loxahatchee River Water Control District to respond to a punctured sewer main in Tequesta, Fla.

State Road 5 in Riviera Beach For Gibbs and Register

State Road 5 in Riviera Beach for Gibbs and Register

Project Date: 2012-2014

Project Description: Complete installation of water and drainage for FDOT. The project was a challenge, as all roads remained open throughout the project. The MOT plan was a vital part in making the project successful.

Palm Bay Parkway For Community Asphalt

Palm Bay Parkway for Community Asphalt

Project Date: 2012-2014

Project Description: 48" RCP (reinforced concrete pipe) for the drainage, with a poured in place headway. This drainage system was designed for the new roadway.

16 Nanofiltration Project for Seacoast Utility Authority

16" Nanofiltration Project for Seacoast Utility Authority

Project Date: 2012

Project Description: Installation of approximately 3 miles of 16" C-900 PVC pressure main and 4 HDPE directional drills under Military Trail, Central Blvd, I-95 and the Florida Turnpike.

16 Nanofiltration Project for Seacoast Utility Authority

Signature Flight for The Weitz Company

Project Date: 2012

Project Description: 138" CMP Culverts at Palm Beach International Airport for The Weitz Company.



View More Projects ---->